Domestic
Merwede Bridge Asphalt Replacement Requires Three-Day Closure
The Merwede Bridge will be closed from September 24 at 21:00 to September 28 at 05:00 as Rijkswaterstaat replaces its asphalt with a lighter layer to support construction of an adjacent new bridge. Traffic must detour, potentially facing an hour of extra travel time, while speed limits drop to 70 km/h post-repair.
Ozetta summarises; the reporting is the newsroom's